
Building the Footings
The boys all (minus the wee ones), went to work with Hubby this week and built the footings. The inspector came by and it passed, and then it was poured on Monday. We all went to work and did the pouring.
Hubby asked me if I wanted to do some trowelling. He failed to tell me that I would be troweling, until it was done! *laugh*
We all worked with Hubby until it was done. It was hard work! We got the main footings done, plus the garage foundation poured. Next is the pouring of the real foundation for the house.
No comments:
Post a Comment